Winco
Likes Bikes
Monthly trail maintenance of OMV.
The regular track maintenance session is happening on Saturday the 7th September @ 2pm. (always 1st Sat of the month)
It's also the general election day so recommend you get your vote in the morning if you intend on attending the trail session.
Again, a BIG thank you to those who volunteered and turned up on the last maintenance day. Once again we had 20 turn up and a lot was achieved. Well done!
Here is the programme for the day:
• Corral rocks to protect tree trunks and other plants
• Armouring to protect tree roots
• Work on the south side rock garden...
• and general track maintenance
As always make sure you wear sturdy shoes, gloves and a hat, and bring drinking water and a water proof jacket in case of rain plus sunscreen and mozzie stuff to slap on.
MEETING POINT: End of Quarry Road, Hornsby - Parking is well signposted, directing cars to park at the END of the road. If this is full, park in the Dural Street carpark.
We hope you can make it
Winco
SNORC
The regular track maintenance session is happening on Saturday the 7th September @ 2pm. (always 1st Sat of the month)
It's also the general election day so recommend you get your vote in the morning if you intend on attending the trail session.
Again, a BIG thank you to those who volunteered and turned up on the last maintenance day. Once again we had 20 turn up and a lot was achieved. Well done!
Here is the programme for the day:
• Corral rocks to protect tree trunks and other plants
• Armouring to protect tree roots
• Work on the south side rock garden...
• and general track maintenance
As always make sure you wear sturdy shoes, gloves and a hat, and bring drinking water and a water proof jacket in case of rain plus sunscreen and mozzie stuff to slap on.
MEETING POINT: End of Quarry Road, Hornsby - Parking is well signposted, directing cars to park at the END of the road. If this is full, park in the Dural Street carpark.
We hope you can make it
Winco
SNORC