Trail Maintenance/Build day Frenzy and XC circuits.

aussie pete

Likes Dirt
The TMBC will be holding a maintenance/build day on Sunday 2nd December, the work will officially start at 2pm but if some of you prefer to work the morning post up and I will get info to you on what needs to be done.
For those wanting to work the Frenzy meet at Harvey st gazeebo, for those who want to work the XC circuits meet at Amos rd gazeebo.

Work to be carried out on the day

Frenzy- Obviously we need to keep pushing with the armoured burms near the top, to finish these on the day would be great but to do this we need a big turn out from all DH riders. There will be a Dh maintenance rep there to give instructions in more detail on what needs to be done to get this to completion.

XC trails-With the upcoming xmas/dx we need to cleen up the area around Amos gazeebo and under the gazeebo itself.
-Certain sections of the Rollercat and Turkey need to be cut back with the brushcutters
-The last left hand berm on the north leg of RC needs to be cleaned up and the proceeding straight down to the exit is earmarked for a feature which will be a series of logs to form a double.
-Cutting in and Flagging the Rollercat extension, this particular job will be started on the day but will continue for possibly the next couple of months.

For the Frenzy work we will need a couple of utes to cart a bit of soil and a couple of shovels and 20l buckets.
For the xc work the club has a couple of brushcutters(Can the people who have these bring them to the park or make prior arrangments), otherwise we will need mattocks, rakes, shovels, brushhooks etc.

As you can see there is a lot of work to get through so if you can spare a bit of time on Sunday your help will be greatly appreciated.
Remember your PPE and bring adequate water for yourself.
The club will provide refreshments at the end of the day for those who have volunteered their time and equipment.
If I have missed anything or you have other ideas or questions post up.
 
Last edited:
Top