rowdyflat
chez le médecin
Yeah some of that is marketing bullshit and i am not really involved but professionals are building onto and rebuilding or realigning some of the existing 80 + kms of mtbike stuff and building a giant figure of 8 with a crossover at the high point near "Redhill" and the apex of the 8 at Beechworth.
The new bits we are allowed to ride at present are bermy and flow well.
I believe the above mentioned waterfall will be bridged , currently we cross on a slippery aluminium ladder or take off our shoes and wade across.
The new bits we are allowed to ride at present are bermy and flow well.
I believe the above mentioned waterfall will be bridged , currently we cross on a slippery aluminium ladder or take off our shoes and wade across.