Man Space / Bike Shed Layout

Steady racks. Front wheel up and on, rack then swings sideways.

Dont know what room you have but this will get them off the floor if you have height and wall space.
The head office is round the corner from mine so see them a lot. They do take up a bit of floor space though. I have a kegerator I might get rid of that I could maybe use for a couple of bikes though

I still like those pedal mounts, CyclingDeal still does a similar one
Buy BIKEHAND Bike Bicycle Cycling Pedal Wall Mount Hangers for Road, MTB or Hybrid Bikes | CD (cyclingdeal.com.au)
 
When we stayed in Cascade House in Derby in November, the 2 bike rooms had 8 of these in each room. I would mount them as high as possible and not worry about rolling the bikes on.

Plenty of options out there and many different price points.

Just get the Lift 4000, its the deluxe version of the 400 ;)

maxresdefault.jpg
 
When we stayed in Cascade House in Derby in November, the 2 bike rooms had 8 of these in each room. I would mount them as high as possible and not worry about rolling the bikes on.

Plenty of options out there and many different price points.

Just get the Lift 4000, its the deluxe version of the 400 ;)

View attachment 399295
I have those speaker stands in my study...
 
Tell me there's some solar panels and a Tesla battery in there? Elon is a fucking genius.
 
Mine is due for a proper sorting out - I have just filled it with stuff wherever it would fit.

It does the job but not 100% happy with it though.
 
Here's the state of my shed...
1683507004406.png

1683507097130.png


It let's plenty of natural light in, but security and keeping things dry are not it's strong points right now. Roof will go in this week with any luck.

Yard is a mess at the moment with ret wall drainage, stormwater, and services all going in. Of course Ballarat weather is making things 'fun'.
1683507300203.png
1683507331000.png
1683507357192.png
 
For the purposes of the building permit, yes. Who knows what phone calls I may feel like making 1 millisecond after receiving sign-off.

Oh indeed. Did that make much of a difference to the approval process?
 
Back
Top