What does your day look like?

Dales Cannon

lightbrain about 4pm
Staff member
Condition of borrowing cousin's concrete mixer was to weld up the hole in the bowl and replace the rusted loop of pipe that serves as a strut.

Cut the loop off with the cordless bandsaw.

Grabbed an offcut of 2.5t gal flat. Cut it to length, chucked it in the press to make it skid like. Then found an offcut from the rollcage. About the right length. Measured the pipe frame and the skid goes just where the pipe gets squashed. First section is oval 45mm wide, next is longer oval 25mm wide. Notched the rollcage tube 44mm then test fitted. Hmm just need to notch the other side 10mm further up at 25mm. Did that. Nice!



Tack welded it. https://www.rotorburn.com/forums/in...rom-the-fuckwits.257029/page-282#post-3320888 bought new batteries then welded it.



Done! Left the tape repair on the bowl. For now anyway.
 
Top