Saw that one a week ago, the picture does not do it justice, huge. I think it will be ride around for a while.
If someone is feeling energetic could they also cut / pull out the grass coming out of the embankment just below the rock / cliff bit between Chandler and Pipe Bridge. It’s annoying me as I line up for the run up that section (yes, it’s a huge injustice, I know).
The heavy rain eroded certain sections of the Pipe Bridge to Bell Bird ST; however, it’s still ok.
Thanks to the trail fairy that cut the low branch on the tree towards the top of the piece of ST which links the boulie to the low side ST next to the Freeway bridge (between the PB and Bell Bird), and to the berminator in the Burke Rd Billabong.